NOTICE: Current & upcoming infrastructure projects in the Town of Carbonear

Powell Drive Street & Storm Upgrades – Phase 3

The project consists of upgrades to the street infrastructure of Powell Drive, continuing from the end of Phase 2 for an approximate length of 340m.  The upgrades consist of new asphalt, storm sewer infrastructure (ditching, catch basins, and drainage piping), curb and gutter (one side), and sidewalk (one side).

 

Cross Roads Water Sewer Road Upgrades and Beach Road Sewer Sizing Upgrade

Cross Roads Water Sewer Road Upgrades

The project consists of upgrades to the street infrastructure at Cross Roads between the intersection with Pike’s Lane, at the north end, and the intersection with Pond Side Road to the south.  The area being upgraded is approximately 240m long.  New water and sanitary sewer mains and stormwater infrastructure being installed, as well as new asphalt, curb and gutter and sidewalk- one side.

Beach Road Sewer Sizing Upgrade

The project consists of upgrading the sanitary sewer main at Beach Road between the intersection with Adelaide Street, at the north end, and the lift station located at the intersection with Pike’s Lane, to the south.  The new sanitary sewer main will provide additional system capacity.  The length of the sewer main replacement is approximately 315 m.

 

Lemarchant Road Extension Water Sewer Storm Road Upgrades

The project consists of upgrades to the street infrastructure at Lemarchant Road Extension between the intersection with Joe Taylor’s Lane, at the west end, and the intersection with Suttons Hill, to the east.  This section of Lemarchant Road is gravel surface.  New water and sanitary sewer mains and stormwater infrastructure will be installed, as well as new asphalt, curb and gutter and sidewalk -one side.